Five times winner of the Publisher Podcast Awards, including Best Technology Podcast, Engineering Matters celebrates the work of engineers who use ingenuity, practicality, science, theory and determination to build a better world. In the UK alone 5.7million people work in engineering related enterpr...
Recent Episodes
380
Nov. 19, 2026
#380 Project Overruns: From the Indus to the Data Centre
Major infrastructure projects consistently cost more and take longer than planned. After more than a century of building megaprojects, some sectors show little or no evidence at getting better at estimating them. In this episode, we speak with an expert in project cost and schedule overruns. From an early fascination with Pakistan’s great dams and work financing infrastructure at the World Bank, then on to research at the University of Oxford covering sustainable megaprojects, this is a career
379
Nov. 5, 2026
#379 The Cost of Time: Modern British Manufacturing
Manufacturing accounts for 8% of UK GDP directly. Counting its supply chains and the spending of the people it employs, that figure rises to 23%, according to a 2024 Oxford Economics study for the Manufacturing Technologies Association (MTA). Yet the sector pays some of the highest energy costs in Europe and relies heavily on imported materials. It also struggles to recruit, held back by an image that no longer matches the modern factory floor. At the same time, many workshops are sitting partl
378
Oct. 22, 2026
#378 Revisited: Designing Dinorwig – Inside Electric Mountain
In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in its history. It was the largest civil engineering contract ever awarded by the government and became the biggest construction project in Europe. Engineering teams had to burrow 750m deep into the Cambrian slate of Elidir Fawr mountain at Dinorwig, North Wales to create the underground power station and a 16km labyrinth of t
377
Oct. 8, 2026
#377 German Offshore Wind and the Mudflats of the Wadden Sea
Germany needs 70GW of offshore wind power connected to its grid by 2045, part of an estimated 300GW total capacity by 2050 for all of the nations bordering the North Sea. To achieve that ambitious goal it needs to run power cables through the Wadden Sea, the world’s largest system of intertidal sands and mudflats. The area is difficult to work within due to its dynamic environment, sensitive habitats, and bird nesting locations contributing to its World Heritage site status. The North Sea itsel
376
Sept. 24, 2026
#376 Sandy’s Left Turn: Building a Resilient Manhattan
In October 2012, Hurricane Sandy turned sharply west and drove a storm surge into New York Harbor. Lower Manhattan flooded, a substation failed leaving more than 220,000 people without power, and damage across the wider region reached $65–70 billion. Protecting the Lower East Side from the next storm means threading flood walls, berms and deployable gates through one of the densest parts of the city. Defences sit above generations of utilities: sewers, water mains, power and telecommunications
375
Sept. 10, 2026
#375 Innovation Champion – Engineering Matters Awards
In this episode, we celebrate Showerkap, winner of the Innovation Champion category in the Engineering Matters Awards 2026. The final award of the series. Judged by representatives from the Institution of Mechanical Engineers and Engineers Without Borders UK, the award recognises innovation across all of this year’s categories. Showerkap won gold for technology designed to reduce the water and energy wasted in showers. Its system uses sensors to monitor showers at fixture level, helping buildin